Real-time certainty. Independently assured.

Independent delivery assurance for infrastructure programmes

Know what is really happening on every site, before anyone asks. Every asset accepted on time, with the evidence to prove it.

Powered byPointRock

The problem

Programmes don't fail suddenly.

They drift, in the gap between site and boardroom.

  • Weeks lateReports reach the Board long after the work.
  • Self-certifiedEvidence is signed off by the people doing the work.
  • Accepted with gapsMissing evidence surfaces at acceptance and handover, when it is hardest to fix.

Ask Dahju*

Just ask. Every answer comes with proof.

Back to dashboardDashboard / Ask Dahju* / Before the boardIllustrative data
You asked by voice, today at 08:14

“Is there anything I should be aware of before the board?”

0:04
Dahju* answered from 214 verified recordsData cut-off 08:00

No surprises for the board. Three things to know, and one needs your decision today.

11 of 12 programmes are on course and assurance confidence is 87%. Holme Valley is the only programme off track, and two of the three items sit there. Each item links to its source, so you can check the evidence before you go in.

  1. Off trackHolme Valley Storage Tanks

    Tank 2 slab pour is 19 days behind

    Now 6 November, was 18 October. A second pour crew recovers 12 of the 19 days, and the recovery plan needs your approval today.

    Milestone 6 Nov9 verified recordsDaniel Okafor, 22 Oct
    Open site detailHolme Valley, Overview
  2. Issue 4Holme Valley Storage Tanks

    Temporary works check is 6 days overdue

    The Tank 2 formwork and propping check must be signed off before the pour can start, so it sits on the recovery path.

    Due 18 OctBlocks the pourTemporary works register
    Open in Evidence LogFiltered to issue 4
  3. At riskAshby Water Treatment Works

    Commissioning pack is at risk for 14 November

    6 critical snags are still open with 21 days to acceptance. Filter bank 3 photos were verified yesterday, so the gap is snag close-out, not the works.

    Milestone 14 Nov6 critical snagsPhotos verified 23 Oct
    Open programmeAshby, milestones

How sure is this answer?

87%

Matches portfolio assurance confidence. Only independently verified records are used.

Verified records read
214
Programmes checked
12 of 12
Unverified claims left out
3
Data cut-off
08:00 today

Record status, not a safety determination

Checked and clear

  • Northfield Reservoir WorksSpillway handover on track for 28 Nov. Cube tests passed today.

  • Eastbrook Trunk Main RenewalSection 3 pressure test on 3 Nov. Section 2 certificate is awaiting review. Watch, no action yet.

  • 8 other programmesOn track, with verified evidence matching reported progress.

The Verified Evidence Chain

From a photo on site to a decision in the boardroom.

Capture once, verify once, report everywhere.

  1. 01

    Capture

    On phone or tablet, by your site staff or trained capture operatives. Works offline, time and location sealed.

  2. 02

    Verify

    Your Assurance Lead checks every item. Nothing turns green on self-declaration.

  3. 03

    Aggregate

    Verified items build readiness, blockers and the acceptance clock for every asset.

  4. 04

    Assure

    Your approver decides. The boardroom sees readiness, blockers and what needs them today.

A site engineer kneeling at the work face, capturing evidence of a pipe joint on a tablet.

At source

Every pour, pipe and panel. Verified.

Dahju* captures what is really happening on site, then proves it.

A Dahju field team in orange and yellow hi-vis on a grassy reservoir embankment, gathered around a supervisor in a Dahju branded hi-vis jacket and white hard hat who is capturing site evidence on a tablet.
Field captureReservoir works. Evidence is captured on the embankment and verified before the team leaves site.
Two site engineers in orange Dahju jackets reviewing a tablet beside a black Dahju branded pickup truck on a construction site, with a crane behind them.
On siteEach capture is sealed with time and location, right beside the work.
A tablet in a rugged case at a treatment works at golden hour showing a Dahju* site page, and a gloved hand holding a phone with a live Dahju* site camera view.

In the field

Capture on site. See it in the boardroom.

Your site teams capture photos, voice notes and checks on phone or tablet, even with no signal. Only verified items count, and leaders see them live.

  • Offline capture, time and location sealed
  • Voice notes become draft visit reports
  • Submitted, then verified, never self-declared
  • Board-ready reports, independently assured

What Dahju* does

See what the site actually is.

  1. Hand over

    Every asset accepted on time, with the evidence to prove it and no surprises after.

  2. Report

    Live, independently assured reporting from site to boardroom.

  3. Know before you're asked

    Ask what needs you today. Every answer opens to the sealed evidence behind it.

Who it's for

Built for the people who answer for delivery.

Directors and sponsors

Know what needs you today, with proof behind every answer.

Delivery and receiving teams

One verified picture of every asset, its blockers and its acceptance date.

Assurance Leads and assurers

Independent evidence, ready when the auditor or regulator asks.

Dahju* works for the client side. It is never a contractor marking its own work.

  • Infrastructure
  • Energy
  • Transport
  • Buildings
  • Water
  • Utilities
A programme team in hi-vis vests reviewing live progress on a tablet in a site office, with a Dahju programme progress board on the wall and a Dahju hard hat and flask on the table.

Act

One verified picture for the whole programme team.

Site teams and programme leads work from the same verified evidence. Contractors answer through their own scoped portal, and anything they submit is labelled as theirs until it is verified.

Three executives at a boardroom table reviewing an assured report on a tablet, with a frosted Dahju logo etched on the glass partition beside them.

In the boardroom

Every figure on the page traces back to verified site evidence.

Ask Dahju*Is there anything I should be aware of before the board?

Ready for the Board, the auditor and the regulator, without waiting for the next report.

The name

Dájú means sure.

In Yoruba, dájú means sure, certain. That is the promise: certainty you can stand behind, for the life of every programme.

Built byPointRock

Pilot programme

Join the Dahju* pilot.

We are working with a small group of infrastructure owners and sponsors. Bring two or three projects entering acceptance. Over 8 to 12 weeks we measure where you start, then show what changed.

  • 01

    Two or three projects

    Assets entering acceptance, set up from your existing lists and deliverables.

  • 02

    Measured before and after

    We baseline days to acceptance and defects open at acceptance, then measure again.

  • 03

    8 to 12 weeks

    Live use by your team, with a direct line to the people building Dahju*.

  • 04

    Your data stays yours

    UK hosting, multi-factor sign-in, you own your data, and nothing is used to train AI models.

Book a demo or join the pilot

See it on your programme.

A short walkthrough, built around your questions.

Or see the demo now

Bookings open shortly. Online booking is being connected, so nothing you enter here is sent yet.